Welcome: Shanghai Selfu High Temperature Cable Co.,Ltd  Language:

Industry-news


Industry-news

How to connect heating wire to lead wire

How to connect heating wire to lead wire ?


There is only one correct wiring method for heating wire, It need to open the film, and then connect the terminal, any other wiring method, although it can be used, but not safe, it is best not to use other methods.

Terminal is a kind of accessory product used to achieve electrical connection, which is divided into the category of connectors in industry.  The terminal is used to facilitate the connection of the wire, which is actually a piece of metal sealed in an insulating plastic, with holes at both ends for inserting the wire, and screws for fastening or loosening.

For example, two wires, sometimes need to be connected, sometimes need to be disconnected, then they can be connected with terminals, and can be disconnected at any time,


Prevent defective insulation of wiring terminals

1,Inspecting for insulation material

The quality of raw materials has a great influence on the insulation performance of insulators.  Therefore, the choice of raw material manufacturers is particularly important, can not blindly reduce the cost and lose the quality of materials.  Should choose a good reputation of the factory materials.  And for each batch of materials to carefully check the batch number, material certification and other important information.  Do a good job of material use traceability data.

2, Checking for insulation resistance

Some production plant process requirements to assemble into finished products and then test the electrical performance, the result because the insulation resistance of the insulator itself is not qualified, had to scrap the whole batch of finished products.  The reasonable process should be 100% process screening in the state of the insulator parts to ensure that the electrical properties are qualified.


Process for connecting heating wire to lead wire


1,Need peel off end of the heating wire, Then connect copper pipe with heating wire,
2,Put heat shrinkable tube on the copper pipe,
3,Connect power wire,
4,Cover heat shrinkable tube on the power wire,
5,Use tools to tighten heat shrinkable tube,

6, Power wire to connect socket use, This time, The heating wire can normal work,




CATEGORIES

LATEST NEWS

CONTACT US

Contact: Kevin Wang

Phone: +86-15221873936

Tel: +86-15221873936

Email: kevin@selfuelectricalwire.com

Add: J.4thFloor.Building 36,No,70 Bole Road,Jiading,Town,Jiading District.Shanghai.China

Leave a message

Facebook

LinkedIn

Youtube

instagram

+86-15221873936

whatsapp

kevin@selfuelectricalwire.com

Top